Fraud Blocker

Our Case Studies

High-rise glazed building in London where Height Tech installed 20 glazing units
Twenty high-level glazing units installed on a London redevelopment that other contractors had turned down.
Rope access technicians installing cladding panels over a pitched roof in Hatfield
A full façade cladding package over a pitched roof in Hatfield. On site two days after the first call.
Powered access and banner masts at MediaCityUK during the World Cup banner installation
A reusable World Cup banner system at MediaCityUK: custom mast brackets, banner frames, installation and removal.
Rope access technician working alongside the drilling rig at India House, Manchester
Rope access test drilling and core sample recovery at India House, Manchester, with a specialist drilling company.
Rope access technicians carrying out façade snagging on Pall Mall, King Street, Manchester
External snagging across the façade and windows of Pall Mall on King Street, planned with a drone survey.
Rope access technicians replacing smoke actuators in the University of Wolverhampton atrium
Atrium smoke actuators and wiring replaced by rope access, at less than half the cost of scaffold quotes.
Height Tech technician at the Rylands Building clock face, Manchester
Class A EN795 anchors designed, installed, tested and certified for the clock face and gantry on the Rylands Building.
Two rope access technicians repainting a gable elevation of Bridgewater House, Manchester
Repainting and repairs to two gable elevations of Bridgewater House, a listed building in Manchester city centre.
City Labs, Manchester, where Height Tech installed additional façade fixings by rope access
Additional façade fixings installed by rope access on City Labs, Manchester, after a drone survey of the building.
Two rope access technicians fitting Christmas lights on high-level steelwork at the Arndale Centre, Manchester
Christmas lights fitted on high-level steelwork for NEXT at the Arndale Centre, Manchester, over two night shifts.
Quadpod rigging set up on the roof at Bolton University for the sign installation
Campus sign surveys, new EN795 anchors and a replacement illuminated LED sign at Bolton University.
Rope access technicians replacing façade tiles at St George's Island, Manchester
Twelve months of glazing, curtain wall, cleaning and façade tile work for Starfish at St George’s Island, Manchester.
Restored dome and tower at Manor Mill, Oldham
Wind-damaged dome and flagpole at Manor Mill, Oldham, restored with new copper sheeting, fixings and paint.
Rope access technician abseiling the mill elevation at Allied Mills, Trafford Park
Leak detection, certified EN795 anchors and new watertight silo flashings at Allied Mills, Trafford Park.

Get In Touch